Saturday, July 17, 2010

My wind turbine in operation

The electrical inspector was here today so that we can connect to the grid. (someday).  We had to power it up so he could see it running.  It was a great windy day.

http://www.youtube.com/watch?v=WF8g09jVZ0E

2 comments:

  1. How much power have you produced so far? Do you have power data logging, with wind speed monitoring/logging for your site?

    ReplyDelete
  2. Anonymous,
    I can only test right now, until I'm ok'd by my power company to run on the grid. That will hopefully be soon. I will definately be posting my results once they approve me to connect. I'll be building my own power curve too. July and August are the worst times of year for wind so my first readings will be the lowest of the year.

    ReplyDelete