That is a pretty pathetic power production. When my ReDriven 20KW worked actually worked (for may be a week or so out of 3 years), we made that much power in one day. I think there is still something wrong with yours.
I have four ReDriven Aurora inverters, 20kW controller with current firmware), dump load, tower disconnect switch, utility disconnect switch for a 20kW turbine installation for sale. EG GridTieEnergy LLC
That is a pretty pathetic power production.
ReplyDeleteWhen my ReDriven 20KW worked actually worked (for may be a week or so out of 3 years), we made that much power in one day.
I think there is still something wrong with yours.
Looks like the inverter mppt tables are not correct. EG GridTieEnergy LLC
ReplyDeleteI have four ReDriven Aurora inverters, 20kW controller with current firmware), dump load, tower disconnect switch, utility disconnect switch for a 20kW turbine installation for sale. EG GridTieEnergy LLC
ReplyDeleteGo here for my experience with ReDriven EG GridTieEnergy LLC
ReplyDeletehttp://www.facebook.com/media/set/?set=a.1596787513982.2084063.1064791020&type=1&l=0bec25dacd
http://www.facebook.com/media/set/?set=a.1596754193149.2084057.1064791020&type=1&l=7f09dc9ab0
http://www.facebook.com/media/set/?set=a.1596681391329.2084050.1064791020&type=1&l=d2f8029516